January 1-2 2017 Update: lower side skins

January 1: Continued work on riveting structure, right lower side skin attached.   Riveted F-01412 bulkhead to aft bottom   skin and attached this skin to the remaining structure.  
January 2: Extensive riveting (mostly backriveting) of skins to bulkheads.   Used MK-319-BS and MK-321-BS in some areas where reach of the called out rivets made for smaller shop heads or rivets were very hard to buck.  A few "oops" rivets needed and a couple of skin dings where rivet partner   (KLB) and I miscommunicated.




-->