Saturday, June 30, 2018
Friday, June 1, 2018
June 1st 2018 Update - waiting for the finishing kit
Since last post I've mostly been doing a few odds and ends - finished up the fuse kit by installing the control sticks and wiring harnesses for these: I added extensions which I connected using dsub pins with shrink wrap. This made it easier to get the wires to the sticks. Worst part of Van's design I've found so far: it is IMPOSSIBLE to route the stick harnesses with molex connectors in place through the structure from tunnel to sticks as Van's prescribes. Even getting the bare wires through there is very hard. It's an insanely tight space to work it and the angle is very hard to make. (Rant over).
Finish kit should be here in a couple of weeks, excited to get that going.
Finish kit should be here in a couple of weeks, excited to get that going.
Subscribe to:
Posts (Atom)
-
I attended Synergy Air's fundamentals class on September 10th. Completed a practice project. This was a very good learning experience...
-
I decided to go with Archer antenna for VOR/ILS - installed in the right wingtip. I had to remove 5 nutplates, match drill antenna to fit...
-
Progress is slow right now thanks to work travel interrupting my airplane building. I've been working on avionics. Finished the cent...