Wednesday, August 1, 2018
Monday, July 30, 2018
Sunday, July 29, 2018
Canopy construction begins...
Back from Oshkosh and vacation, started on the canopy. I had prepped a few parts before leaving but today got going in earnest. Lots of fussy fitting and many clecos in/out/in/out. Finally satisfied with fit of these parts to canopy skin. I took it all apart, deburred, scuffed, and started the priming / paint process. Hopefully will start some riveting tomorrow.
Sunday, July 22, 2018
Planning for panel.
First - not much happening on build as I'm taking time off to take a vacation which includes a couple of days at EAA Airventure in Oshkosh.
I've been working with Nick at SteinAir over the past few days to plan my panel. This is the latest revision of the plans. I'd love to hear opinions from those who follow this blog!
N-number should be N14VB, pending confirmation from FAA.
I've been working with Nick at SteinAir over the past few days to plan my panel. This is the latest revision of the plans. I'd love to hear opinions from those who follow this blog!
N-number should be N14VB, pending confirmation from FAA.
Tuesday, July 17, 2018
Making (slow) progress on finish kit
Shortly after receiving the finish kit, I started the installation of the rear window. Followed instructions very precisely/carefully and when almost finished with drilling, I noticed a crack on the leading edge: this crack extended about 2 1/2 inches. So... I re-ordered the window. Got this installed over this past weekend, no issues. Also have completed the canopy open/close mechanism and have started prepping parts for main canopy including initial riveting of the canopy hinge assemblies. Lots of parts cut out from punched parts and also prepped to varying degrees.
Heading to Oshkosh soon so won't be getting back to work for the next 10 days or so.
Heading to Oshkosh soon so won't be getting back to work for the next 10 days or so.
Saturday, June 30, 2018
Friday, June 1, 2018
June 1st 2018 Update - waiting for the finishing kit
Since last post I've mostly been doing a few odds and ends - finished up the fuse kit by installing the control sticks and wiring harnesses for these: I added extensions which I connected using dsub pins with shrink wrap. This made it easier to get the wires to the sticks. Worst part of Van's design I've found so far: it is IMPOSSIBLE to route the stick harnesses with molex connectors in place through the structure from tunnel to sticks as Van's prescribes. Even getting the bare wires through there is very hard. It's an insanely tight space to work it and the angle is very hard to make. (Rant over).
Finish kit should be here in a couple of weeks, excited to get that going.
Finish kit should be here in a couple of weeks, excited to get that going.
Subscribe to:
Posts (Atom)
-
I attended Synergy Air's fundamentals class on September 10th. Completed a practice project. This was a very good learning experience...
-
I decided to go with Archer antenna for VOR/ILS - installed in the right wingtip. I had to remove 5 nutplates, match drill antenna to fit...
-
Got quite a bit done. First, I've been cleaning up wiring, putting shrink wrap over wires where they might chafe, adding cable ties, j...