Friday, March 10, 2017

March 9-10: Empennage fairings and fitting rudder offset tabs.

March 9:


Finished sanding R Elevator cap, primed this and fitted to elevator.  Riveted in place.  

March 10:

Primed empennage gap fairings.  Fabricated rudder stop offset tabs, primed these, match drilled them to rudder horn, and riveted in place.  Filled gaps on top surface of right HS and elevator tips, sanded.  

No comments:

Post a Comment

Panel nearly done, starting work on cowl baffles

I spent most of the time since last post finishing up wiring for panel, installing panel screens (G3X and G5), installed transponder antenn...