Since last post I've completed several tasks including:
- Installed baggage side covers
- Touched up paint in baggage area
- Installed flap actuation system
- Installed fuselage wiring harnesses
- Installed elevator pushrods
- Installed pitch and yaw servos in tailcone (still need to attach to the rudder cables - will wait until I have empennage mounted
I still need to install control stick bases, stick link pushrod, aft-most elevator pushrod and then test range of elevator movement.
The only incomplete section on the fuselage is now the rollover structure - hopefully the completion of this will coincide with arrival of finishing kit.