Saturday, June 30, 2018
Friday, June 1, 2018
June 1st 2018 Update - waiting for the finishing kit
Since last post I've mostly been doing a few odds and ends - finished up the fuse kit by installing the control sticks and wiring harnesses for these: I added extensions which I connected using dsub pins with shrink wrap. This made it easier to get the wires to the sticks. Worst part of Van's design I've found so far: it is IMPOSSIBLE to route the stick harnesses with molex connectors in place through the structure from tunnel to sticks as Van's prescribes. Even getting the bare wires through there is very hard. It's an insanely tight space to work it and the angle is very hard to make. (Rant over).
Finish kit should be here in a couple of weeks, excited to get that going.
Finish kit should be here in a couple of weeks, excited to get that going.
Friday, May 4, 2018
Wednesday, May 2, 2018
A forest of clecos - and a very sore hand
Since last post, I fitted the co-pilot stick to its base and checked travel limits of the stick (as well as verifying that stick bases are contacting both stops: I had previously checked this and filed one of the stops so this was just a verification). I'm good with stick travel - about 14.5 degrees down and 25 degrees up so no adjustments needed at stick. It will be a while before I install the aft-most control rod because I need to move things around in the shop to get the HS / elevators mounted in order to check travel there.
Also prepped / primed the rollover structure parts, and starting by riveting the two "halves" of the forward and aft sections of the roll bar. Next I clecoed the structure together and final-drilled from #40 to #30. LOTS of cleco action here - my right hand is very sore!
I'll deburr everything well and start riveting this in the next day or two.
Also prepped / primed the rollover structure parts, and starting by riveting the two "halves" of the forward and aft sections of the roll bar. Next I clecoed the structure together and final-drilled from #40 to #30. LOTS of cleco action here - my right hand is very sore!
I'll deburr everything well and start riveting this in the next day or two.
Sunday, April 29, 2018
April 29 Update - odds and ends including flap position sensor.
I installed the flap position sensor today. I replaced the micro-molex connectors with Deutsch DTM connectors. Also used DTM connectors for the power wires. Nice
I ordered a bunch of these and will be using them where it makes sense.
I've started deburring parts for the rollover structure and painting parts that will be part of that section.
Also fitting control sticks (I ordered Tosten sticks from Vans) to the bases, preparing to install sticks and stick connecting rod.
I ordered a bunch of these and will be using them where it makes sense.
I've started deburring parts for the rollover structure and painting parts that will be part of that section.
Also fitting control sticks (I ordered Tosten sticks from Vans) to the bases, preparing to install sticks and stick connecting rod.
Monday, April 23, 2018
April 23 Update - close to wrapping up fuselage
Since last post I've completed several tasks including:
- Installed baggage side covers
- Touched up paint in baggage area
- Installed flap actuation system
- Installed fuselage wiring harnesses
- Installed elevator pushrods
- Installed pitch and yaw servos in tailcone (still need to attach to the rudder cables - will wait until I have empennage mounted
I still need to install control stick bases, stick link pushrod, aft-most elevator pushrod and then test range of elevator movement.
The only incomplete section on the fuselage is now the rollover structure - hopefully the completion of this will coincide with arrival of finishing kit.
Monday, April 16, 2018
April 16 Update - Baggage area
Before installing the baggage area floors, I decided to install conduits between fuselage sides and the tunnel: there is provision for snap bushings in this space for the fuse harness, but I'll be running extra wires plus the 1/4 tubing for pitot/AOA. The conduit (made of 3/4" PEX as in the wings) will make it easier to route these into the tunnel, with less risk of chafing. I mounted low to avoid any interference with rudder cables.
Installed both baggage floors - only step left is to rivet the floors to aft bulkheads. Floors are strong as rock - nice to be able to sit back there on a stable surface for working inside fuselage.
Installed both baggage floors - only step left is to rivet the floors to aft bulkheads. Floors are strong as rock - nice to be able to sit back there on a stable surface for working inside fuselage.
Subscribe to:
Posts (Atom)
-
I attended Synergy Air's fundamentals class on September 10th. Completed a practice project. This was a very good learning experience...
-
I decided to go with Archer antenna for VOR/ILS - installed in the right wingtip. I had to remove 5 nutplates, match drill antenna to fit...
-
Got quite a bit done. First, I've been cleaning up wiring, putting shrink wrap over wires where they might chafe, adding cable ties, j...