-->
Drilled the elevator horns, first through the center flange bearing then after securing both elevators through the bearing with hardware, drilled the lower part of the horns. Attached horizontal stabilizer to tailcone, drilled 4 aft spar holes to 1/4", secured HS to tailcone with hardware. Attached VS to tailcone in preparation for attaching rudder. |
No comments:
Post a Comment