With help from Max: placed moving blankets on shop floor and moved the tail cone to this area. Then I used built-up moving blankets and floor mat material to "bridge" all the bulheads, finally putting a foam mattress pad in place so I could crawl into the tail and back rivet the remaining rivets in upper skin. Turned out very good. Did some prep for Section 11. SECTION 10 COMPLETE (FINALLY)