Sunday, February 26, 2017

February 22-25: Work on fiberglass fairings rudder, VS, HS, elevators

February 22:

Bonded tail light mount to rudder bottom fairing

February 23:   

Sanded and prepped fiberglass tips for HS, elevators, VS, and rudder.  Used 80 grit for high spots, 220, then wet sanded with 400 grit.  

February 24: 

Installed rudder top fairing, left elevator fairing, and drilled/clecoed right elevator fairing
February 25:

Completed install of right elevator fairing.  Completed install of rudder bottom fairing including touching up primer.  Laid up fiberglass for VS top fairing and both HS tip fairings.








No comments:

Post a Comment