February 22:
Bonded tail light mount to rudder bottom fairing |
February 23:
Sanded and prepped fiberglass tips for HS, elevators, VS, and rudder. Used 80 grit for high spots, 220, then wet sanded with 400 grit. |
February 24:
Installed rudder top fairing, left elevator fairing, and drilled/clecoed right elevator fairing |
February 25:
Completed install of right elevator fairing. Completed install of rudder bottom fairing including touching up primer. Laid up fiberglass for VS top fairing and both HS tip fairings. |
No comments:
Post a Comment