After all the steps and prepping parts: Finished riveting the forward canopy skin to the substructure. Now will fit the "close out" (final drill) and rivet it. I'm very pleased with both my riveting (OK I had to drill out about 4 rivets) and the "twist" at this point. Down to .1-.2 degrees. I don't think I can do much better than that. I have also completed the rear "bow" and side rail prep so the rest of the canopy structure will go together very quickly.
Friday, August 10, 2018
Subscribe to:
Post Comments (Atom)
-
I attended Synergy Air's fundamentals class on September 10th. Completed a practice project. This was a very good learning experience...
-
I decided to go with Archer antenna for VOR/ILS - installed in the right wingtip. I had to remove 5 nutplates, match drill antenna to fit...
-
Progress is slow right now thanks to work travel interrupting my airplane building. I've been working on avionics. Finished the cent...
No comments:
Post a Comment