Saturday, November 12, 2016

November 12, 2016 update: Elevator parts prep and partial assembly, drilling error

-->
Long day of work.


Completed Section 9-2.  Final drilled elevator tip assemblies.  Completed Section 9-4.  Bent close-out tabs on skins and drilled the pilot holes in trim tab hinges.  Completed Section 9-5 - for left elevator only.  Error at this point - I drilled 5/8 hole in wrong place on one elevator spar.  So I'm moving on with left elevator and will complete the right elevator when I get the replacement part. Completed 9-6 for left elevator (Skeleton assembly, drilling etc).  Completed Section 9-7.  Completed Section 9-8 for left elevator only.   Completed Section 9-9 up to step 3 for left elevator only.   Completed section 9-10 (left elevator)

No comments:

Post a Comment