Wednesday, November 30, 2016

November 30, 2016: rolled & riveted right elevator leading edge


 Rolled the leading edges of the right elevator and riveted.  Looks very good. I have "perfected" the technique of using a "half" u-bolt and vice grips to fully roll the edge without bending at the spar flange.  








No comments:

Post a Comment

Panel nearly done, starting work on cowl baffles

I spent most of the time since last post finishing up wiring for panel, installing panel screens (G3X and G5), installed transponder antenn...